Utility Solar Farm Land Acreage & MW DC Calculator
Size utility-scale ground-mount photovoltaic solar farms: calculate land acreage requirements (4.5 to 6.5 acres per Megawatt DC with single-axis tracking and Ground Coverage Ratio GCR 0.33-0.38), solar farm annual MWh energy yield, landowner long-term ground leases ($800-$2,000/acre/year), and solar developer project returns.
1. Project & Operating Inputs
2. Financial Breakdown & Yield
UTILITY SOLAR MW & ACREAGE30-Year Solar Land Lease Revenue
$0
Solar Farm Developer IRR
0.0%
Gross Revenue / Bill
$0
Total Project CapEx
$0
Operating / Material Cost
$0