Host Agreement Protocol

Commercial EV Host Site Agreement & Utility Protocol

🅿️ Parking Stall Licensing & Lease Rent

  • Monthly Stall Rent: Base rent of $300 to $600/stall/month OR 8% to 12% revenue share of gross charging fees.
  • Dedicated Use: Stalls strictly designated for "Active EV Charging Only" with tow-away enforcement signage.
  • Term Length: 10-year initial term with two 5-year mutual extension options; recorded memorandum of lease.

⚡ Utility Easement & Transformer Pad

  • Dedicated Utility Meter: CPO installs separate utility drop; zero charging electricity billed to host building.
  • Civil Trenching & Restoration: Operator fully restores asphalt, curbs, landscaping, and re-stripes lot to municipal code.
  • Concrete Pad Specs: 8-inch reinforced concrete equipment pad for heavy step-down transformer & switchgear.

🛡️ Uptime SLAs & Preventative Maintenance

  • ⚠️ NEVI 97% Uptime Mandate: Operator contractually guarantees 97.0% dispenser operational uptime per port.
  • ⚠️ Emergency Response: 4-hour remote diagnostic triage and 24-hour on-site technician dispatch for faulted chargers.
  • Graffiti & Vandalism: Operator maintains 100% liability for hardware repair, cable replacement, and screen cleaning.

📜 Insurance, Indemnification & Decommissioning

  • 💎 Commercial General Liability: Operator maintains minimum $5,000,000 per occurrence policy naming host additional insured.
  • 💎 Host Hold Harmless: Full indemnification protecting landowner from vehicle fires, battery malfunctions, or trip hazards.
  • 💎 Removal & Restoration: Operator must remove all chargers, bollards, and wiring within 90 days of lease termination.